IN-PROGRESS
INSTALLATION
1) Set
the two end posts of a given run. 2) string a line betwen them. 3)
startb setting panels and posts, working down the line. With
each post, it is set on a bed of 3" pea gravel and with the
same pea gravel 2/3rds the way up the hole, basically stabilizing
the post in place. The panels are mounted to the posts with
the pre-bored holes, insuring the laeral alignment of the posts. 4) Once
competed with the run, return to fine-tune the post to the string
line using a digging bar into the pea gravel. 5) Follow up with a
8" cap of concrete with each posthole. 6) Cut the
posts 3-3/4" above the panel 7_ pre-bore the post caps and seal
their undersides before mounting. Completion. Stand back
and be prepared for the kudos of admiring neighbors and passers-by
who will surely weigh in on the quick transformation with the sort
of remarks that no one tires of hearing.
|